Hydro One's Technical Interconnection Requirements document contains a set of design requirements for distributed generation development within Hydro One Networks' distribution system in the province of Ontario. Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below Rev 2, was released on July 6, 2011 and can be downloaded below (Adobe Acrobat Reader required).
Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below (6.6 MB)
More details about the Technical Interconnection Requirements document can be found in our recent Webinar presentations.
Technical Interconnection Requirements Document Notification of Revisions Table
Note: The Technical Interconnection Requirements (version DT-10-015 R2, June 2011) will be updated with the above revision(s) and replaced on the website when appropriate.
Learn more about Distribution-connected Generators and the Feed-in Tariff (FIT) program.