Western Brampton Reinforcement Project Hydro One Networks Inc. is proposing to build two new 230-kilovolt (kV) underground transmission lines to reinforce the electricity supply in the City of Brampton. This project will address increased electricity demand resulting from strong economic growth and development in the community, and ensure a reliable supply of power for future growth.

The proposed underground lines would be constructed completely within an existing transmission corridor, which extends from Hydro One Brampton's Jim Yarrow Municipal Transformer Station (MTS) at Steeles Ave and Chinguacousy Rd. to Hydro One's planned Hurontario Station located on the Parkway Belt near Hurontario St. and Hwy 407. The two new underground cable circuits will extend about 3 kilometres in length (see map below). There is currently an existing 230 kV overhead transmission line located on this corridor, which will not be modified.