General Terms and Conditions
Hydro One General Terms and Conditions for Compatible Land Uses.
Hydro One general conditions for Compatible Land Use
General Requirements for Construction Work in the vicinity of underground cables
A document outlining safety measures and requirements for installations and work in the vicinity of Hydro One’s underground cable assets.
General requirements for construction work by external parties
Hydro One Site Representation Request Form
Document for providing details regarding construction, excavation and daylighting activities in the vicinity of Hydro One's underground plant.
Representation Request Form
Compatibility Review Checklist
A checklist ensuring applications for proposed land uses within the Right-of-way contain all the required information.
Hydro One compatibility review checklist
Relocation Process Flow Charts
Visual guides detailing the steps for relocating infrastructure affected by third-party proposed installations.
Hydro One asset modification process workflow
Compatible Species List
A list of Hydro One-compatible plant species that may safely be planted within Right-of-Way (ROW). Any landscape plan within ROW needs to be submitted for review as topography changes by location and line height will impact the compatibility of vegetation to be planted within the ROW.
Microshocks Information Sheet
This sheet outlines low-level electrical shocks that can occur due to induced voltages near power lines.
Microshocks information sheet