Project Resources

2019 Annual Groundwater and Surface Water Monitoring Report

2018 Annual Groundwater and Surface Water Monitoring Report

2017 Annual Groundwater and Surface Water Monitoring Report

2016 Annual Groundwater and Surface Water Monitoring Report

2015 Annual Groundwater and Surface Water Monitoring Report

Groundwater and Surface Water Baseline Conditions Reports

Other Reports, Permits, Technical Memos and Plans

Hydrogeologic & Hydrologic Assessment Report

Stantec (2014) Hydrogeologic & Hydrologic Assessment Report Clarington Transformer Station, 1609-60745. Prepared for Hydro One Networks Inc., Stantec Consulting Ltd., Kitchener, Ontario, 102 pages.

 

Permit to take Water, Hydrogeological Assessment, and Appendices

Read the Permit to Take Water Report and Appendices for the Clarington Transformer Station

 

Technical Memo on Nitrate Detections in Groundwater Sampling

Stantec Technical Memo: Nitrate Detections in Groundwater Sampling - April 28,2016

 

Conditions of the Minister of Environment and Climate Change's Decision

View our Contingency and Pollution Prevention Plan, also known as the Emergency Response Plan.

Read the Final Acoustic Assessment Report for the Clarington Transformer Station.

View the letter to the MOECC advising that all of the conditions described in the Minister's Decision have been satisfied.

 

Clarington TS Well Interference Response Plan

Clarington TS Well Interference Response Plan 


 



Map – Project Area

Project Area

Map – Our Transmission System

Clarington Transmission System Map

Map – Conceptual Area

Conceptual Area

Map – Natural Features 

Natural Features

Map – Schematic of Proposed Clarington TS

Schematic of Proposed Clarington TS

Map – Schematic of Oak Ridges Moraine

Schematic of Oak Ridges Moraine

Map – Clarington TS Watershed

Clarington TS Watershed




Clarington Transformer Station Video: Spill Containment System

 



Time-lapse of Clarington TS construction as of May 4, 2016